Four HR app screens: a home screen with a running timer, an attendance record, a submission list, and a profile.

Replacing something people already knew how to use

5 min read

Four features on the rebuild of an HR app my colleagues opened every morning. The question was never what to build. It was what a change is worth costing the person on the other end.
Role
UI/UX Designer — mobile PWA and web admin
Timeline
Sep 2025 - Feb 2026
Team
1 PM, 2 back end, 2 front end, 2 designers
Live
Donasi — released 8 Sep 2025, updated 19 Jan and 27 Feb 2026 · Break & Duration — released 22 Oct 2025
Designed in the backlog
Asset · Overtime & Reimbursement
Status
New KerjaYuk! released, migration from the old one under way

The constraint nobody writes into a brief

KerjaYuk! wasn't a new product. People had been using the old one for years to clock in, claim overtime, and get things approved. They knew where everything was.

That changes what a good design is. On a new product, an improvement is just an improvement. On a replacement, every change you make spends something that already belongs to somebody — and you're asking them to learn it again on a Tuesday morning, while they're trying to clock in before they're late.

So all four features came down to the same question. What is this change worth to them, and what should stay exactly where they left it?

Four features, four different answers.

What I chose not to touch

Overtime & Reimbursement.

I brought this across from the old app: new layout, new components, and adding a submission now opens a modal instead of a separate page. The submission and approval flow I left alone.

That was the decision, not the absence of one. People file overtime when they're owed money, usually at the end of a long month and usually in a hurry. Whatever else the rebuild moved, I wanted this to be the part nobody had to work out again.

Overtime and reimbursement screens: a submission list, a detail with a receipt attached and approve and reject buttons, and an edit form.
Overtime and Reimbursement, carried across from the old app. Adding a submission opens a modal; the approval trail runs superior, department head, finance.

It's the shortest section on this page and it took the least time. It's also the call I'd defend the hardest.

One day, and the number nobody could see

Break & Duration.

I had a day to design this across the mobile app and the web admin, on my own.

The old app already had the pattern, called Pause. I kept it and changed the word to Break. What I spent the day on was something that had never been visible: break duration, the gap between someone starting a break and picking work back up, sitting in the daily record where management and HR could actually read it.

An admin attendance table with a per-employee timeline of Check-In, Break, Resume, Update and Check-Out rows, each carrying a duration, beside a mobile sheet offering Break, Update and Check Out, and a home screen with a running break timer.
Break and duration across both surfaces, released October 2025. On the phone the break runs as a live timer; in the admin the same break is a row with a duration, inside the day's timeline.

The feature existed because a prospective client had people working two shifts in one day, and the old model of a working day couldn't hold that. So most of the time went into the days that don't go to plan — somebody who misses checkout, a break still running when you look, a day with two check-ins where the second checkout never arrives.

A day is enough to design one thing properly or three things badly. I spent it on the number and on the awkward days, and left the screen where people already knew how to find things.

The one person in the flow who wasn't an employee

Donasi.

Our company runs a foundation, and it needed a record of what was given, to whom, and what became of it. I took the mobile side: four points of view — secretary, treasurer, management, and the partner receiving the donation — plus the notifications, which double as a way to approve without opening the app.

Donation screens: a submission form, a five-step approval trail, an activity report upload, and a notification carrying approve and reject.
Donasi, released September 2025. A submission runs through management, treasurer, partner and secretary, and each step can be taken from the notification.
A Donasi Form with fields for event, source of funds, category, period and amount, and buttons to save a draft or submit.
The submission form: event, source of funds, category, period, amount, and the receiving division and contact.
A reviews list with one card marked Need Approval.
The Reviews tab, filtered by month, type and status. Each card carries its status and who raised it.

Most of the shape came from an approval process that already existed. One part of it couldn't.

Everyone in that flow works for the company except one. The partner is a foundation doing the actual distributing, and Rejected is a word a company uses about work it commissioned. Being told your report was rejected by the people funding you is a different sentence than it looks on a status chip. We decided as a team, the PM and both designers, that the partner's step would work like an approval underneath and read as something else on the surface. When a report needs another look, it says Need Revise.

An approval trail with three steps approved and one waiting, above the submission's details and two buttons: Revisi and Setujui.
The partner's step. The trail shows where the submission has reached, and the two actions are Revisi and Setujui.
An Approve Submission? sheet with an optional note already filled in, and a confirm button.
The approval confirmation, with an optional note that travels with the decision.
A notification list with one unread item carrying Tolak and Setujui on the notification itself.
The notification list. Approve and reject sit on the notification, so a decision can be made without opening the submission.
A Submission Approval sheet opened from a notification, showing the full submission before the confirm button.
Approving from the notification. The sheet carries the same detail as the submission page before the decision is made.

Small on paper. The existing structure couldn't be made dynamic, so getting there took a lot of back and forth with the engineers, and it would have been easier to reuse the state that was already sitting there.

The change I'm most pleased with came out of a room, not out of me. Before development started I built a Figma prototype and walked the secretary, treasurer, and management through it with the PM. The activity report at that point was three fields: describe what happened, attach evidence, add a note.

They wanted something else. Let the partner tick off what was actually distributed and put a quantity against each item. And have them attach each child's school report, so the donation could be seen reaching the people it was meant for.

The form got longer and the partner's job got harder, and it was still right. I had designed a form that asked someone to describe. What a foundation needs is one that asks them to account.

A partner's report with tick-box allocation lines carrying quantities, and an Upload Rapor Anak section listing four children, two with files attached.
The partner's activity report after the prototype session. Rincian Alokasi itemises what was distributed with a quantity against each, and Upload Rapor Anak takes a school report per child.
Before: one description field with attachments. After: a dated allocation checklist with quantities, and a per-child report upload.
The activity report before and after the prototype session. Before: a description and attachments. After: a dated allocation checklist and a report per child.

Borrowing a pattern people already trust

Asset.

Tracking who's holding which piece of company equipment, what's in transit, and what arrived damaged. Nothing internal to reuse here, and the layout and the flow were mine to work out.

So I looked outside. Confirming a delivery of company assets is the same act as confirming a delivery on Shopee or Tokopedia — and those flows have been tested against more people than any internal tool will ever reach. They also arrive already understood. Everyone receiving a laptop has confirmed a parcel on a Sunday evening.

The first version I drew didn't hold, and it gave way at rejection. Requirements were still arriving in pieces then, and rejection is where handing over equipment gets complicated. It took about two weeks, in the gaps between higher-priority work, to reach a version I was satisfied with.

The state I'd point at is a delivery where some items are accepted and some go back. Most confirmation flows treat a shipment as one decision. A box with six things in it and two of them damaged needs the system to hold both answers at once, and the person confirming it shouldn't have to choose which half of the truth to file.

A handover package listing four identical monitors marked Received, Missmatch, Received and Broken, beside a package list and an asset detail.
Asset handover. A package can hold several identical items, and each one is confirmed on its own row — Received, Missmatch or Broken.
Asset confirmation: a checklist selecting three of five items, a photo-evidence step showing a size error, and a signature step.
The confirmation flow: select the items being received, attach photo evidence per item, then sign for the handover.

What I'd do differently

I'd ask about rejection first. Not only on Asset — on all of it.

Every one of these features looked simple until something inside it went wrong: a shift that doesn't close, a report that needs redoing, a box that's half right. That's where the design time actually went, and every time, I got there only after the good day was already drawn.

Now I'd draw the bad day first. It's harder to start with, it settles the structure sooner, and the good day tends to fall out of it for free.